Skip to content

XIOPro Production Blueprint v5.0

Part 13 — Execution Log


1. Purpose

This is the living record of what has been done, decided, and changed during the XIOPro build.

It serves 000 (BrainMaster) as: - execution memory across sessions - proof of progress for Shai - input for Idle Maintenance and Dream Engine - foundation for sprint retrospectives - context recovery after compaction or session restart

It is NOT a replacement for tickets or the ODM. It is the narrative thread that connects them.


2. Session Log

Session: 2026-03-28 (Day 0 — Grounding + BP v5.0)

Duration: ~8 hours Actors: 000 (BrainMaster), Shai, 003 (Brand Brain), 010 (Mac Worker) Phase: Phase 0 — Grounding

Completed

# What Status Notes
1 Read and evaluate BP v4.1 (all 9 parts + 3 reviews) Done Spawned 2 parallel readers
2 System state snapshot for ChatGPT migration prompt Done Full 10-section snapshot
3 Service Fate Map (14 containers mapped) Done resources/SERVICE_FATE_MAP_v4_2.md
4 BP v5.0 Corrections doc (30+ items) Done resources/BP_v4_2_CORRECTIONS.md
5 CLI Tools Assessment (7 must-haves) Done resources/CLI_TOOLS_ASSESSMENT.md
6 PostgreSQL DDL schema (21 tables, 27 enums) Done resources/SCHEMA_walking_skeleton_v4_2.sql
7 Produce BP v5.0 Parts 1-9 (3 parallel agents) Done All 9 parts in v4_2_SET/
8 Security: Firewall enabled (UFW, Tailscale SSH) Done Root password set, struxio has sudo
9 Security: Git history cleaned (plaintext secrets purged) Done git-filter-repo, force pushed
10 Security: Supply chain tools researched (Phylum, Socket.dev, GuardDog) Done Phylum rejected, Socket.dev adopted
11 Brand brief v1 (003 Brand Brain) Done struxio-design/03_brand/BRAND_BRIEF_v1.md
12 CLI tools installed on Hetzner Done jq 1.8.1, yq 4.52.5, fd 10.4.2, fzf 0.70.0, uv 0.11.2, gh 2.89.0
13 Stale containers retired (devxio-frontend, devxio-bridge) Done 123 MB freed
14 Host Resource Awareness added to BP (Parts 1, 3, 4) Done Host as ODM entity, OOM prevention
15 Agent Runtime Currency added to BP (Part 1) Done Daily version checks across hosts
16 System Capability Map diagram (Part 1, Section 6.1) Done Mermaid LR diagram, fixed twice
17 XIOPro Control Bus architecture (Parts 2, 4, 8) Done Full spec: SSE push, intervention, tasks, spawn
18 Control Bus tickets (TKT-1001 to 1008) Done 8 tickets created in Paperclip
19 Skill Registry added to BP (Part 5, Section 8.9) Done Central SKILL_REGISTRY.yaml pattern
20 Agent Activation Architecture (Part 4, Section 4.10) Done Slim activations, Dream-as-optimizer
21 struxio-knowledge repo created and seeded Done Technology evals + architecture decisions
22 Obsidian integration expanded in BP (Part 5) Done Living knowledge companion with vault structure
23 Aggressive timeline (10-14 days) set in Part 10 Done MVP1 starts midway
24 Paperclip projects created and tickets organized Done XIOPro, XIOPro_Beta, MVP1 — all tickets assigned
25 010 (Mac Worker) tasked via bus (git sync, Obsidian, SSH keys) Done Bus seq 158
26 Unified Agent Identity Model (3-digit IDs, role bundles) Done Parts 1, 3, 4, 11. All old names migrated.
27 Data Access Rule — Bus API vs Direct PostgreSQL Done Part 2 Section 5.8
28 Complete agent naming migration (all 12 parts + resources) Done ~209 references updated
29 User entity added to ODM Done Parts 1, 3, 4, DDL. Replaces hardcoded "founder".
30 Idea entity added to ODM Done Parts 3, 4, DDL. Full lifecycle with periodic review.
31 Skill Selection Architecture Done Parts 4, 5. 3-step filter: role → task → model.
32 Awesome Claude Code research Done 15 repos scanned, top tools identified
33 ccusage installed Done Token usage tracking now visible
34 Knowledge vault: 13 technology evaluations Done struxio-knowledge, indexed
35 Execution Report as derived ODM view Done Part 3 Section 14A
36 Part 11 Execution Log created Done This file

Decisions Made

Decision Rationale BP Reference
Bus MCP → XIOPro Control Bus Merge Bus persistence + Ruflo orchestration into one service Part 2, Section 5.8
Paperclip kept during transition Study adapter model, retire after Control Center parity Service Fate Map
Dream Engine → Idle Maintenance for T1P Prove concept on real optimization (activation files, skill dedup) Part 4, Section 4.9.9
Neo4j retired (deprecated) 1.83 GB freed. Both instances stopped and removed. PostgreSQL + pgvector handles all T1P needs Part 5, Section 12.1
Phylum rejected → Socket.dev adopted Veracode acquisition killed free tier Knowledge vault: technology/
CLI-First principle CLI over MCP where both exist Part 1, Section 4.12
4-digit ticket numbering (1001+) Historical 3-digit preserved, new work starts at 1001 Part 3, Section 2.7
10-14 day aggressive timeline Shai directive, budget flexible Part 10, Section 7A
struxio-knowledge as 7th repo Governed knowledge, Obsidian sync Part 5, Part 10

Open Items (Carry Forward)

Item Status Needs
backup.sh has plaintext B2 credentials Not fixed Root SSH to encrypt with SOPS
pg_dump not in backup scope Not fixed Root SSH to modify backup.sh
direnv not installed (needs sudo/apt) Deferred Next sudo session
Obsidian vault setup on Mac 010 tasked Waiting for 010 session
SSH key mismatch (Mac -> Hetzner) 010 tasked Waiting for 010 session
BP Part 1 review remarks from Shai In progress Shai reviewing
Bus upgrade coding (TKT-1001) Starting Day 1 execution

Session: 2026-03-29 (Day 1 continued -- fresh context)

Duration: Full day Actors: 000 (BrainMaster), Shai, 010 (Mac Worker) Phase: Phase 1 -- Execution

Completed

# What Status
1 Context rotation -- fresh session from state files Done
2 Bus full verification (18/18 pass) Done
3 Walking skeleton re-verified (17/17 pass) Done
4 BM (000) + MO (010) registered in Control Bus Done
5 Neo4j permanently removed (swarm service deleted) Done
6 Paperclip stale agents cleaned (10 deactivated, 7 remain) Done
7 SSE real-time wiring for UI widgets Done
8 UI design polish (stats row, accent bars, compact tables) Done
9 Idle Maintenance cron (daily 05:00 UTC) Done
10 Activation v2 rollout (8 slim files for all agents) Done
11 Librarian API (4 endpoints: search, document, topics, stats) Done
12 Research Center automation (weekly source scan cron) Done
13 Obsidian Librarian decomposition (13 new vault notes) Done
14 Paperclip to ODM data migration (45 tickets migrated) Done
15 Review/test enforcement (execution discipline + Playwright + review gate) Done
16 Shai's ToDo List / Attention Queue widget (auto-generating, Bus API) Done
17 GO/MO launcher commands (devxio go/mo, GO, MO) Done
18 Naming conventions formalized in BP Part 8 Done
19 Workspace graph script + daily cron Done
20 T2P to Phase 2 terminology fixed across BP Done
21 README files for devxio-control-center + struxio-knowledge Done
22 Context Rotation Protocol added to BP Part 4 Done
23 Hetzner Cloud API researched (hcloud installed) Done
24 Porkbun DNS API researched Done
25 RC Architecture designed (3-phase plan) Done
26 CLI Services framework designed (12 services) Done
27 Open WebUI deployed (chat.struxio.ai, pending DNS) Done
28 BP cross-reference sweep (7 gaps fixed) Done
29 devxio-control-center pushed to GitHub (struxio-devxio-ai) Done
30 Control Center debugging (in progress) In Progress

Decisions Made

Decision Rationale BP Reference
Activation v2 (slim files) 8 lean activation files replace monolithic prompts, faster agent startup Part 4, Section 4.10
Librarian API as REST endpoints CLI-first access to knowledge, no MCP dependency Part 5, Section 4
Attention Queue auto-generation Bus API generates todos from tickets, alerts, pending decisions Part 3, Section 4.14; Part 6, Section 10.1
Open WebUI for LLM chat Self-hosted alternative to external chat UIs, runs on Hetzner Part 8
RC Architecture 3-phase Research Center builds incrementally: sources, scanning, synthesis Part 5, Section 8.10
CLI Services framework (12) Unified devxio CLI for all operational commands Part 2, Section 5.12
Context Rotation as protocol Prevents context loss across long sessions, state-file driven Part 4, Section 4.10

Open Items (Carry Forward)

Item Status Needs
backup.sh has plaintext B2 credentials Not fixed Root SSH to encrypt with SOPS
pg_dump not in backup scope Not fixed Root SSH to modify backup.sh
Control Center debugging In Progress Frontend runtime errors need resolution
chat.struxio.ai DNS Pending Porkbun DNS A record for Open WebUI
direnv not installed Deferred Next sudo session

3. Ticket Ledger

XIOPro Project (Active)

Ticket Title Status Assignee Phase
1001 SSE Push Channels Todo -> Starting 000/002 Phase 1
1002 Agent Registration Todo 000/002 Phase 1
1003 Intervention Endpoints Todo 000/002 Phase 1
1004 Task Orchestration Todo 002 Phase 1
1005 Host Capacity Todo 002 Phase 2
1006 Agent Spawn Todo 000 Phase 2
1007 Cost Tracking Todo 002 Phase 2
1008 Governance Events Todo 002 Phase 2

T2P Execution Tickets (Day 1)

Ticket Title Status
T2P-01 SSE Real-Time Wiring for UI Widgets Done
T2P-02 UI Design Polish (stats row, accent bars) Done
T2P-03 Idle Maintenance Cron (daily 05:00 UTC) Done
T2P-04 Activation v2 Rollout (8 slim files) Done
T2P-05 Librarian API (4 endpoints) Done
T2P-06 Research Center Automation (weekly scan) Done
T2P-07 Obsidian Librarian Decomposition (13 notes) Done
T2P-08 Paperclip to ODM Migration (45 tickets) Done
T2P-09 Review/Test Enforcement Done
T2P-10 Attention Queue / ToDo Widget Done
T2P-11 GO/MO Launcher Commands Done
T2P-12 Naming Conventions in BP Done
T2P-13 Workspace Graph Script + Cron Done
T2P-14 Open WebUI Deployment Done
T2P-15 RC Architecture Design Done
T2P-16 CLI Services Framework Design Done
T2P-17 Hetzner API Research + hcloud Install Done
T2P-18 Porkbun DNS API Research Done
T2P-19 BP Cross-Reference Sweep Done

Overnight Sprint Tickets (2026-03-30)

Ticket Title Status
TKT-2001 react-mosaic layout framework integration Done
TKT-2002 Color palette + design tokens Done
TKT-2003 Sidebar component (hidden/icons/full) Done
TKT-2004 Widget scrollability + overflow handling Done
TKT-2005 Save/switch layouts (localStorage + API) Done
TKT-2006 Widget persistence across sessions Done
TKT-2011 Chat Panel widget (9 features) Done
TKT-2012 ContextPrompting mode selector Done
TKT-2013 Terminal widget (xterm.js) Done
TKT-2020 Agent auto-pickup from Bus Done
TKT-2021 Context rotation watchdog Done
TKT-2023 CLI services implementation (12 services) Done
TKT-2030 Template Registry (4 templates) Done
TKT-2031 Project lifecycle phase tracking widget Done
TKT-2032 Project selector widget Done
TKT-2034 Knowledge Expert domain definitions Done
TKT-3001–3010 Content creation tickets (10 items) Todo

Pending Ticketization

These items are in the BP but not yet ticketed: - Morning brief generation - Control Center frontend debugging (in progress) - Activation overhaul (GO/MO/Specialist/Worker/None) — 5 new files - md2pdf skill


4. Infrastructure State

Hetzner CPX62 (as of 2026-03-29 evening UTC)

Metric Value
Containers 10 (Neo4j permanently removed, 2 retired Day 0)
RAM used ~3.5 GB of 30 GB
Disk used ~46 GB of 150 GB
Firewall Active (UFW, Tailscale SSH)
Claude Code v2.1.86
AutoDream Enabled
CLI tools jq, yq, fd, fzf, uv, gh, rg, tmux, hcloud

Services Running

Service RAM Status
Caddy 55 MB Healthy
Bus MCP 107 MB Healthy (SSE wiring complete)
PostgreSQL (bus) 44 MB Healthy
Paperclip 263 MB Healthy
Paperclip DB 76 MB Healthy
Hindsight 1.06 GB Healthy
LiteLLM 576 MB Healthy (not actively routing)
Tickets renderer 43 MB Healthy
Dashboard 11 MB Healthy
ISO 19650 engine 57 MB Healthy
Open WebUI ~200 MB Deployed (pending DNS)

Cron Schedule

Cron Time What
Idle Maintenance 05:00 UTC daily Cleanup, health checks, log rotation
Research Center scan Weekly (Sunday 03:00 UTC) Source registry scan for new publications
Workspace graph Daily (04:00 UTC) Regenerate dependency graph
Backblaze backup 02:00 UTC daily B2 bucket sync (backup.sh)

5. Update Protocol

This Part 11 is updated by 000 (BrainMaster): - At the end of each session - When a significant decision is made - When tickets change status - When infrastructure changes

It is the first thing 000 (BrainMaster) reads on session start (after plan.yaml).


Session: 2026-03-30 00:00-02:00 UTC (Overnight Sprint)

Duration: ~2 hours Actors: GO (000), Shai Phase: Phase 1 — Control Center UI Build

Completed

# What Ticket Status
1 react-mosaic layout framework integrated TKT-2001 Done
2 Color palette + design tokens established TKT-2002 Done
3 Sidebar component (hidden/icons/full modes) TKT-2003 Done
4 Widget scrollability + overflow handling TKT-2004 Done
5 Save/switch layouts (localStorage + API) TKT-2005 Done
6 Widget persistence across sessions TKT-2006 Done
7 Chat Panel widget (9 features: history, search, model selector, streaming, attach, shortcuts, export, pin, collapse) TKT-2011 Done
8 ContextPrompting mode selector (selector UI in chat panel) TKT-2012 Done
9 Terminal widget (xterm.js, full PTY, resize, copy-paste) TKT-2013 Done
10 Agent auto-pickup from Bus (GO/MO poll on startup) TKT-2020 Done
11 Context rotation watchdog (token budget monitor + auto-rotate) TKT-2021 Done
12 CLI services implementation (12 services under devxio CLI) TKT-2023 Done
13 Template Registry (4 templates: IT Project, Research, Content, Sprint) TKT-2030 Done
14 Project lifecycle phase tracking widget TKT-2031 Done
15 Project selector widget (multi-project switcher) TKT-2032 Done
16 Knowledge Expert domain definitions (template + domain map) TKT-2034 Done
17 Content creation tickets written (TKT-3001 through 3010) TKT-3001–3010 Done
18 Activation overhaul: GO/MO/Specialist/Worker/None roles (5 new activation files) Done
19 md2pdf skill created (Markdown to PDF conversion skill) Done

Decisions Made

Decision Rationale Impact
react-mosaic selected over golden-layout Simpler API, React-native, MIT license, active maintenance TKT-2001; replaces golden-layout evaluation
GO/MO naming replaces BM/M0 Cleaner role semantics: GO = Global Orchestrator, MO = Mac Orchestrator All activation files, CLAUDE.md, Part 4
Opus for orchestrators, Sonnet for implementation Cost vs capability balance — orchestrators need reasoning depth Model routing config, activation files
MO runs locally on Mac (not SSH to Hetzner) Lower latency for Mac-side tasks, avoids SSH hop overhead MO activation, launcher commands

Open Items (Carry Forward)

Item Status Needs
backup.sh has plaintext B2 credentials Not fixed Root SSH to encrypt with SOPS
pg_dump not in backup scope Not fixed Root SSH to modify backup.sh
chat.struxio.ai DNS Pending Porkbun DNS A record for Open WebUI
Control Center frontend debugging In Progress Runtime errors need resolution
direnv not installed Deferred Next sudo session
TKT-3001–3010 content tickets execution Pending Assign to content/knowledge agents

Changelog

Date Change
2026-03-28 Part 11 created (was Part 10). Full Day 0 session log, decisions, open items, ticket ledger, infrastructure state.
2026-03-28 Unified Agent Identity Model: Updated all agent references from BM/B1-B5/M0/C0 to 3-digit IDs (000/001-005/010/020). Updated ticket assignees to 3-digit IDs.
2026-03-28 Neo4j deprecated: Both instances (graph_stack, librarian) marked as removed. Decision updated from "evaluate" to "retired". Infrastructure state updated.
2026-03-29 Day 1 continued session log added (30 items, 7 decisions). Infrastructure updated (10 containers, cron schedule, Open WebUI). T2P execution tickets (19) logged.
2026-03-30 Overnight sprint log added (19 items, 4 decisions). GO/MO naming adopted. react-mosaic selected. Content tickets TKT-3001–3010 written. Activation overhaul + md2pdf skill.